Welch & Wandsworth
General Contractors
CSLB #1158507
Inquire
A plaster hood over the range, with marble carried from the counter to the ceiling behind it

Newport Beach

The cabinetry was built in the room.

A kitchen remodel taken back to the framing. Site built cabinetry in dark oak, a plaster hood over the range, marble carried to the ceiling, and new electrical and plumbing behind all of it.

Featured ProjectsHomes Interiors Kitchens & BathroomsAltadena Fire Rebuild

Select Projects  /  Newport Beach Bespoke

Location
Newport Beach
Scope
Kitchen remodel
Year
2026
Principals on site
Jason and Benjamin

A kitchen taken back to the framing, then built forward.

The room came out to the studs. New electrical and new plumbing were run while the walls were open, the rear of the room was reframed, and everything after that was built forward from a clean shell. What went back in is site built cabinetry in dark oak, crown paneling carried up to the ceiling, a plaster hood over the range, and a marble that runs from the counter to the ceiling rather than stopping at a backsplash line.

The part you cannot see is the reason the rest of it lines up. Cabinet cases built in the room, to the room's own dimensions, so a run meets a wall without a filler strip. Services set out before a single box went in, because power, water and venting all have to be decided while a wall is still open. Appliance openings measured to the appliance rather than to a catalog number. None of that appears in a photograph, and it is the reason nothing here had to be packed out to fit.

We are a licensed California general contractor, led by two principals. You keep your architect and designer. We build what they draw.

One case, three appliances, no gaps

The tall run

One case, three appliances, no gaps.

A full height case in dark oak carrying the refrigerator and the double ovens, with a paneled box above it taken up to the ceiling so the run reads as joinery instead of a line of equipment against a wall. It was built in place, which is why the stile beside the ovens is the width the wall needed and not the width that came in a carton.

Two counters, two jobs

The island

Two counters, two jobs.

A marble prep counter holding the sink and the faucet, and a second working surface in dark stone alongside it, so cooking and sitting do not have to happen on the same slab. The fluted base under the overhang was built on site and runs the full length of it, which is the only way the reeds stay even where the counter turns.

Reeded glass, brass, and ten feet that has to agree with itself

The finish work

Reeded glass, brass, and ten feet that has to agree with itself.

A full wall of dark oak with reeded glass fronts, long brass pulls and a marble counter running under it. Benjamin takes the interior design and the finish work, which on a wall this wide means three upper doors, three drawers and the counter beneath them all have to line up across the whole run. Nobody notices any of it when it is right.

The plaster hood over the range, with the marble carried from the counter to the ceiling behind it

The range wall

A plaster hood, and the marble taken to the ceiling behind it.

A plaster hood over the range, with the marble carried from the counter to the ceiling behind it rather than stopped at a tile line. The shelf crosses the full width at one level, so the wall reads as one piece instead of a grid.

Built into this house

Cabinetry built in the room

Cases made and hung on site to this room's dimensions, rather than ordered to a standard size and packed out at the wall.

Crown paneling to the ceiling

Carried up over the tall run so the case reads as joinery and not as a cupboard with a gap above it.

A plaster hood over the range

Formed on site, and the one soft surface in a room otherwise made of stone, oak and brass.

New electrical, run while the walls were open

Appliance circuits, switching and undercabinet lighting, all set out before a single case went in. There is no tidy way to add any of it afterward.

New plumbing

Behind the walls and under the floor, and invisible in every finished photograph on this page.

Marble carried to the ceiling

The slab does not stop at a backsplash line, which means the runs either side of it had to be set out to the same line before anything was cut.

How it got there

Select any frame to open it
Back to the framing
Back to the framingThe wall opened, the services exposed, and the room measured before anything was ordered.
The rear of the room, out
The rear of the room, outFraming in, the opening sheeted over for containment, and the yard on the other side of it.
The same wall, wider
The same wall, widerStuds, rough services overhead, and a floor that is still a deck.
Drywall, and the first cases
Drywall, and the first casesTaped and floated, floor protection down, and the base cabinetry beginning to land.
The island, built in place
The island, built in placeFramed up on site to the dimension of the room rather than to a catalog size.
The perimeter run
The perimeter runCases set, a protection panel on the wall behind, and the openings left for the appliances that go into them.
The base run, before the fronts
The base run, before the frontsCarcasses, shelves, and the level line everything above it gets set from.

Bespoke means it was built in this room,
not delivered to it.

Newport Beach

If your kitchen is going back to the framing, we should walk it together.

They walk the lot together before a line is drawn. Jason takes the structure and the site, Benjamin takes the details you live with every day. Both of them are on site, on every project, and we only take a few homes at a time so that stays true.

Serving the greater Orange County and Los Angeles area, and the Altadena fire rebuild.

Start a conversation