Welch & Wandsworth
General Contractors
CSLB #1158507
Inquire
The scallop tile band running the full length of the run, behind the range and under the glass fronted uppers

San Juan Capistrano

The backsplash goes all the way around.

A kitchen and bathroom remodel. Custom cabinetry wrapping the room, a dark counter, and a patterned scallop tile that runs the full length of every wall it meets.

Featured ProjectsHomes Interiors Kitchens & BathroomsAltadena Fire Rebuild

Select Projects  /  San Juan Capistrano

Location
San Juan Capistrano
Scope
Kitchen and bathroom remodel
Principals on site
Jason and Benjamin

The kitchen and the primary bathroom, done as one job.

The kitchen came out and went back in. Custom cabinetry wrapping the room, new appliances, a dark counter, and a patterned scallop tile band running the full length of every run. Glass fronted uppers keep the top of the room light, and new flooring runs underfoot. The primary bathroom was taken back at the same time: new fixtures, a double vanity under a veined white top, a glass shower, and a new window to bring the daylight in.

The part you cannot see is the part that set everything else. Cabinet runs laid out so a tile band lands level across three walls and does not step where two runs meet. A blind corner measured before anything was ordered, because the mechanism that goes into it has to be chosen while the box is still a drawing. Electrical moved so the undercabinet lighting reads as a line and not a row of dots. Plumbing moved for a second basin. None of it appears in a photograph, and it is the reason to hire a general contractor rather than a showroom.

We are a California-licensed general contracting firm, led by two principals. You keep your architect and designer. We build what they draw.

It does not stop behind the range

The tile

It does not stop behind the range.

A backsplash usually means the wall behind the cooktop. Here the band carries past the range, along the counter, around the corner and down to the window, at one height the whole way. That only works if every cabinet run and every appliance opening was set out to the same line before the first tile was cut.

One dark plane, turning two corners

The counter

One dark plane, turning two corners.

A dark counter running the length of the room and carrying on around to the seating. Benjamin takes the interior finish work, which on a run this long means the overhang, the seams and the reveal under the tile all have to agree with one another. Nobody notices any of it when it is right.

Built to hold something specific

The drawer

Built to hold something specific.

A full width drawer with a fitted divider tray, made to the inside dimension of that particular box rather than bought to a standard size and packed out with a filler strip. It is a small thing. It is also the difference between cabinetry built for this kitchen and cabinetry delivered to it.

The other half of the job

The primary bathroom

The other half of the job.

Frameless glass on the shower, a dark vanity under a veined white top, and a linear sconce set either side of each mirror rather than one light over the middle. The floor runs in a wide plank, which keeps the room reading as part of the house rather than a box off the bedroom.

Built into this house

A tile band on one level

It runs the perimeter of the kitchen at a single height, past the range and around two corners, without stepping where one run meets the next.

A blind corner with a mechanism in it

The hardest cubic foot in any kitchen. This one swings out in two tiers and brings the back of the cabinet to the front.

A full height pantry on pull-outs

Every shelf comes forward, so nothing ends up living at the back where you forget about it.

Undercabinet lighting, wired first

Run into the cabinets before the boxes went on the wall. There is no neat way to add it afterwards.

Plumbing moved for a second basin

Behind the bathroom wall, and invisible in every photograph on this page.

A new window in the bathroom

The daylight in these frames is the reason it went in. A bathroom that borrows its light from the bedroom never quite works.

The rest of the house

Select any frame to open it
The corner unit
The corner unitTwo tiers on a swing out frame, so the back of the cabinet comes to the front.
Behind the corner door
Behind the corner doorA curved shelf carried right into the angle, with the drawer bank alongside it.
The pantry
The pantryFull height, and every shelf pulls forward so nothing lives at the back.
The double vanity
The double vanityTwo basins under a veined white top, with a linear sconce either side of each mirror.
The room, end to end
The room, end to endRefrigerator, range, tile and counter in one line of sight.

You can see the tile from the doorway.
The rest of it you have to open something to find.

San Juan Capistrano

If the kitchen and the bathroom are the same conversation, we should walk them together.

They walk the lot together before a line is drawn. Jason takes the structure and the site, Benjamin takes the details you live with every day. Both of them are on site, on every project, and we only take a few homes at a time so that stays true.

Serving the greater Orange County and Los Angeles area, and the Altadena fire rebuild.

Start a conversation